GRAMPUS 991840

The ongoing saga of returning a wagon to traffic.

Work started on this wagon in March 2010 alongside the continuing work on LNER brake van 246710.

grampus_991840

From this photo taken on the 5th March 2010 it does not look too bad, nothing that a derust and paint wouldn’t cure.

However take a look over the side.

grampus_flooring

This picture shows the almost non-existent timber flooring, the bent doors and pillars and mis-alignment of the bodyside.

The first task was to remove the rubble and what remained of the flooring. The bricks went to the yard for potential recycling and the spoil was added to the yard ballast surface.

grampus_n_end_1

This photo again on the 5th March 2010. shows another missing item. A removable channel section. This has now been located and fitted.

The wagon was built with the idea that a small dumper could travel through the vehicle and along the train by means of drop ends in the body. The lower section is a hinged panel that drops down on the buffers and above that, are two removable sections with inset timbers that fit within the corner post channel sections.

grampus

This shows it in use. Note the drop down panel and plates covering the gap.

The channel sections are stowed in angled racks mounted underneath the body that are accessed from underneath the buffer beams. The next stage was to descale the wagon, or at least remove the heaviest corrosion, so out with the chipping hammers and needle guns to get into the awkward corners.

No need to worry about leaving a bit as that would be cured by bringing in the shotblasting contractor to remove all the remainder of the rust and spray a coat of grey primer over the wagon. A fair amount of work was undertaken at this stage in replacing wasted angle section and strengthening corner gussets.

number

This photo shows some of the flooring bolts that would need removing, the heavy rusted areas in the corners and as mentioned earlier the channel stowage racks underneath.

The purpose of this wagon joining the fleet is to work alongside the other GRAMPUS 988228 and RUDD 990109 in the disposal of smokebox and firegrate ash originating from the loco stabling facility at Newbridge in the compound alongside the P Way shed.

Ash is loaded, usually by crane on a Friday from a skip into the wagons and then taken to various locations along the railway and used for ballasting in sidings or ground levelling. Pickering Carriage and Wagon sidings, Levisham North end headshunt, the station sidings and Grosmont shed headshunt are just some of the areas visited. 3 wagons are required for the traffic 1 loading, 1 in transit and 1 being offloaded being the idea.

If anybody wants any ash then get in contact with Martyn Cannings at Newbridge. No load is too small (if it gets rid of some ash)

The wagon was then painted in 1950′s Engineers Black. The outside is not too bad to get at but all the angles under the body mean getting your arms into really awkward positions guaranteed to get drips up your sleeves or behind your ears. It helped that the chassis was devoid of a floor at this time as it enabled access to be gained both above and from below.

grampus_998140___03-09-10

The project is under the management of Nick Carter and he can usually be found wielding a paint brush or using a sander.

nick_carter_at_work__03-09-10

Here he has been caught in an action shot complete with graffiti instructions to the rest of us. Nick also does all the signwriting by hand.

Because of the nature of the load and the frequency that machines may be used to offload the vehicle it was thought that the installation of a steel deck floor would be best. This was done with GRAMPUS 988228 and seems successful so we have repeated the exercise on 991840.

The first stage is to install some scrap bullhead rail cut to length to keep the floor height at the original level, though with a slight camber to the sides to facilitate draining.

body_rails

These were then welded into position by Nick Hutchinson our tame welder.

nick_hutchinson__03-09-10

Once the rails are in position, then 5 steel sheets are trimmed to size and fitted in place with backing strips at the joints. All is then welded and ground off. The sheets will be left unpainted as the first couple of loads will wear the paint off anyway.

grampus__8-10-10

The door stanchions have needed to be partially restraightened by means of heat and a hammer. In order to ensure that the doors worked properly, we have had to split some of the door sheets adjust the pin locations then re weld the split metalwork. In addition, many of the door pins have had new retaining chains fitted.

Nick Carter has now completed all the signwriting and all that is left to do now is to straighten one of the end channel sections, some general maintenance to the brake system and replace two of the brake blocks. Hopefully, this will be completed by the end of February, as the wagon is badly needed in traffic.

signing__8-2-11

What next? -but there still remains the LNER brake van E246710 to complete first.
We will wait and see.

Bryan Blundell Friday 11th Feb 2011

Grampus 991840 removed from shed on Thursday 7th April and entered PW use.

grampus__991840_7-4-11_ex_work

grampus_7-4-11_ex_work